HVAC & Airflow

Tunnel/Mine Ventilation Calculator

Fan airflow for tunnel or mine ventilation by workers and diesel equipment.

Enter your values

ⓘ Live results

Results
Required ventilation airflow
44,000 CFM
Worker-based portion
4,000 CFM
Diesel-based portion
40,000 CFM
Fans at 50,000 CFM each
1

Quick answer

Underground ventilation combines a per-worker fresh air allowance with a per-horsepower allowance for diesel equipment exhaust dilution.

CFM = workers x 200 + diesel hp x 100

How to use the Tunnel/Mine Ventilation Calculator

  1. 1Count the peak number of workers underground at once.
  2. 2Total the horsepower of diesel equipment operating simultaneously.
  3. 3Apply per-worker and per-horsepower allowances and take the sum, per common mine ventilation guides.

Worked example

Using the values the calculator loads with:

Inputs

  • Workers underground20
  • Total diesel equipment horsepower400 hp

Results

  • Required ventilation airflow44,000 CFM
  • Worker-based portion4,000 CFM
  • Diesel-based portion40,000 CFM
  • Fans at 50,000 CFM each1

Frequently asked questions

Why per-horsepower for diesel?

Diesel exhaust dilution is regulated separately from human fresh air needs because of DPM (diesel particulate matter) limits.

Does this replace a full ventilation survey?

No — this is a planning estimate; real mine ventilation design also models friction losses and natural ventilation pressure.

About this calculator

Results are estimates for general information. For medical, legal, structural or financial decisions, confirm with a qualified professional.